Wissehr Electrical Contractors was awarded a prime contract by the US Army Corp of Engineers to complete the power distribution upgrades at Lock 27 in Granite City, the busiest Lock along the Mississippi River system. Electrical work included upgrade of the 1,200 amp 480 volt electrical service and power distribution system complete with zone selective interlocking and digital metering. More